With four to five feet of average tide in much of Brunswick County, the choice between a fixed and a floating dock comes down to how you board, what you keep at the dock, and what the site allows.
Start with the tide at your property
NOAA publishes tidal datums for several stations along the Brunswick County coast. Two numbers matter most for a dock: the mean range (average high water minus average low water) and the great diurnal range (the higher high minus the lower low each day). These are long-term averages over the 1983–2001 National Tidal Datum Epoch 1.
- Oak Island, Yaupon Beach: mean range 4.72 ft; great diurnal range 5.27 ft 1.
- Varnamtown, Lockwoods Folly River (near Holden Beach): mean range 3.76 ft; great diurnal range 4.27 ft 2.
- Bowen Point, Shallotte Inlet (between Holden Beach and Ocean Isle Beach): mean range 4.26 ft; great diurnal range 4.77 ft 3.
- Sunset Beach Pier: mean range 4.95 ft; great diurnal range 5.52 ft 4.
Your creek or canal may differ from the nearest station, and wind and storms push water well beyond these averages. Still, the takeaway is clear: on most of this coast, the water at your dock moves four to five feet on a normal day.
How a fixed dock handles that range
A fixed dock sits on pilings at one height. That makes it simple, solid, and a natural partner for a boat lift, but the step down to a boat changes through the day by roughly the tidal range. Because surge is the bigger threat, the North Carolina Coastal Federation recommends raising deck height to reduce flooding risk, using flow-through or slatted decking so water can pass during storms, and setting pilings 10 to 12 feet above high tide 8.
How a floating dock and gangway work
A floating dock rides the water, so the deck stays at the same height above the surface whether the tide is in or out. The trade-off moves to the gangway, the hinged ramp between a fixed pier or bulkhead and the float, whose slope changes with every tide.
An illustration using the Oak Island mean range of 4.72 feet 1: a gangway that is level at mean high water drops about 4.7 feet at its float end by mean low water. On a 20-foot gangway, that is a slope of roughly 14 degrees; on a 30-foot gangway, roughly 9 degrees. Longer gangways ride gentler, and spring tides and wind-driven lows make the low-tide angle steeper than the average suggests.
Holding the float in place
Floats are typically held by guide piles with hoops or by anchors and cables. For floating docks, the Coastal Federation recommends stainless steel tie-down cables and rubber bumpers to extend lifespan and reduce wear, and notes that structural supports in high-risk areas can be tied to helix anchors before a storm 8. Guide piles need enough height that a float lifted by surge does not ride off the top; the Coastal Federation’s general guidance of pilings 10 to 12 feet above high tide to allow for storm surge is a useful reference 8.
Float material matters
Use only fully encapsulated foam floats. Unencapsulated foam can break apart and scatter debris into marshes and waterways 8.
What North Carolina rules say about floating structures
The state’s general permit for piers and docking facilities covers both pile-supported and floating structures in the Estuarine and Public Trust Waters areas of environmental concern, but not on oceanfront shorelines 5. A few conditions are specific to floats or shape their size:
- Floating piers and docks in Primary Nursery Areas, over shellfish beds, or over submerged aquatic vegetation need at least 18 inches between the bottom of the structure and the bottom at normal low water 6.
- No individual component of the docking facility may exceed 400 square feet under the general permit 6.
- Total shaded area for docks and mooring facilities (not counting the access pier) is limited to 8 square feet per linear foot of shoreline, up to 800 square feet 6.
- The facility may provide docking space for no more than two boats, though boats stored on floating or fixed platforms do not count as docking spaces 6.
For repairs, the threshold differs from fixed docks: work on a floating dock, pier, platform, or modular floating system counts as replacement, which needs a permit, when more than 50 percent of the structure’s square footage must be rebuilt 7. Always confirm current requirements with the Division of Coastal Management before work begins.
Floating dock repair: what usually wears out
Floating systems fail at their moving parts and their flotation. Floats that sit low or list, broken or cracked encapsulation, worn hinges and gangway rollers, loose guide-pile hoops, and stretched or corroded anchor lines are the usual suspects. Older foam floats without encapsulation are a common replacement target because of the debris problem 8. Under state rules, work that rebuilds no more than half of a floating structure’s square footage is treated as repair rather than replacement 7.
Which one fits your property?
- A floating dock tends to fit when you board a boat, kayak, or paddleboard directly from the dock, want a consistent step at every tide, or have enough water at low tide to keep floats off the bottom where rules require clearance 6.
- A fixed dock tends to fit when a boat lift does the boarding work, the site is exposed, or the water is too shallow at low tide for floats.
- Both together is a common answer: a fixed pier out to deeper water with a gangway down to a floating section.
We build and repair floating docks, gangways, and anchoring systems, and we will tell you when a fixed structure is the better choice for your water.
Frequently Asked Questions
How much does the tide change at docks in Brunswick County?
NOAA’s long-term averages put the mean tide range at about 3.8 feet at Varnamtown on the Lockwoods Folly River, about 4.3 feet at Shallotte Inlet, about 4.7 feet at Oak Island, and about 5 feet at Sunset Beach Pier. Your exact site can differ, and storms push water well beyond the averages.
Is a floating dock better than a fixed dock?
Neither is better everywhere. A floating dock keeps a steady step to the boat at every tide; a fixed dock is simpler and pairs naturally with a boat lift. Many properties use a fixed pier with a gangway down to a floating section.
Do floating docks need a CAMA permit in North Carolina?
Generally, yes. The state general permit for piers and docking facilities covers floating structures in estuarine and public trust waters, with conditions such as 18 inches of clearance over nursery areas, shellfish beds, or submerged vegetation. Confirm with the Division of Coastal Management for your site.
Can you repair my existing floating dock?
Yes. We repair floating docks, including float replacement, gangway repair, and anchoring or guide-pile work. Replacing old unencapsulated foam with fully encapsulated floats is a common upgrade.
Sources
- Tidal Datums, Station 8659182 — Oak Island, Yaupon Beach, NC, NOAA Tides & Currents.
- Tidal Datums, Station 8659414 — Varnamtown, Lockwoods Folly River, NC, NOAA Tides & Currents.
- Tidal Datums, Station 8659665 — Bowen Point, Shallotte Inlet, NC, NOAA Tides & Currents.
- Tidal Datums, Station 8659897 — Sunset Beach Pier, NC, NOAA Tides & Currents.
- 15A NCAC 07H .1201 — General Permit for Piers and Docking Facilities: Purpose, NC Administrative Code (Office of Administrative Hearings).
- 15A NCAC 07H .1205 — Specific Conditions for Piers, Docking Facilities, and Boat Lifts, NC Administrative Code (Office of Administrative Hearings).
- 15A NCAC 07J .0210 — Replacement of Existing Structures, NC Administrative Code (Office of Administrative Hearings).
- Building Better Docks in Coastal North Carolina (homeowner one-sheet, NOAA Marine Debris Program funded), North Carolina Coastal Federation.
Related services
How we can help
Floating Docks
Stable access that rides changing water levels.
Docks & Piers
Custom docks and piers built for coastal water and the way you use them.
Dock & Pier Repair
Restore aging decking, rails, and pilings before small problems become big ones.
Permitting & Project Planning
Plan the scope, materials, and approvals before the first piling.
Keep reading
More waterfront guides
Dock Piling Repair vs. Replacement: Signs, Options, and What Drives Cost
Pilings carry the whole dock, and most of their damage happens where you cannot easily see it. Here is how to spot trouble, what the repair options are, and what decides between repair and replacement.
Bulkheads vs. Seawalls in North Carolina: Rules, Materials, and Alternatives
The terms get used interchangeably, but North Carolina treats a wall on a sound or canal very differently from one on the ocean beach. Here is what the rules allow and how the material and design options compare.
CAMA Permits for Docks, Piers, Boat Lifts, and Bulkheads in North Carolina
Most waterfront projects on the North Carolina coast need a CAMA permit. Here is how the permit types work, the main numbers in the general permits for docks, boat lifts, and bulkheads, and where the Army Corps of Engineers fits in.
Lets talk
Ready to Improve Your Waterfront?
Tell us what youre planning, where the property is located, and what youd like the waterfront to do for you. Well follow up to talk through options.